Home | Site Map | Legal Mentions | Contact
     
 

Main features


The terminal spreads over of 208 190 square meters along the first dock (darse N° 1) on the port of Gennevilliers. With 2 gantry cranes of a 27 TEU/hour capacity, 6 reach stackers and 6 front lift trucks, this terminal can handle 350 000 TEU a year and store up to 11 000 TEU.

The terminal has been rearranged to maximize space and improve the flow management. The development of the former EDF site, wich is adjacent to the present site along the Seine, will double the capacity of the terminal to reach 600 000 TEU in 2015.

Both terminal platforms have a rail connection. The new terminal will be equipped with a large gantry crane for direct containers transshipment between large barges serving the seaport and the self-propelled barges wich connect the river terminals of the Marne, Seine and the Yonne above Paris.

 
   
   

Regular weekly shuttles

 

 

Maxi river gauge

Maxi river gauge.